Summary of Hydrology | |||||
---|---|---|---|---|---|
Hydrology Name | SFWMM Output Tag Information | Topography | SFWMM out Archive | Interface Status | More Information |
2000B1 | SFWMM v5.0 - 2000B1 | sfwmm_v5.0_topo_091103 | Implemented | CerpZone | |
2000B2 | SFWMM v5.4 - 2000B2 | sfwmm_v5.0_topo_cerp1 | Pending CalVer | CerpZone | |
2050B1 | SFWMM v5.1 - 2050B1 | sfwmm_v5.0_topo_091103 | 2050B1_wmmV5.1_120503_out | Implemented | CerpZone |
2050B2 | SFWMM v5.4 - 2050B2 | sfwmm_v5.0_topo_cerp1 | Pending CalVer | CerpZone | |
Alt7R5 | SFWMM v5.4 - Alt7R5.4.1.1 | sfwmm_v5.0_topo_091103 | alt7r5.4.1.1_out | Implemented | |
Alt7R5Moon | SFWMM v5.4 - Alt7R5.4.1.1moon | sfwmm_v5.0_topo_091103 | alt7r5.4.1.1_moon_out | Implemented | |
Alt7R5Modoff | SFWMM v5.4 - Alt7R5.4.1.1 | sfwmm_v5.0_topo_091103 | alt7r5.4.1.1_modoff_out | Implemented | |
Alt7R5Noact4 | SFWMM v5.4.1.1 - no action planning condition for CSOP | sfwmm_v5.0_topo_091103 | noact4_gdm2_v5.4.1.1_out | Implemented | |
Alt7R5Noact4c | SFWMM v5.4.1.1 - no action planning condition for CSOP | sfwmm_v5.0_topo_091103 | noact4c_gdm2_v5.4.1.1_out | Implemented | |
Links to External Resources:
- Hydrology Name - The name under which the Hydrology Scenario is referenced in the ATLSS Model Interface.
- SFWMM Output Tag Information- This information is derived from tag information imbedded in the SFWMM outputfile daily_stg_minus_lsel.bin. The daily_stg_minus_lsel.bin is the file used by ATLSS to generate the waterfile used for the ATLSS models.
- Topography - The topography used by the SFWMM to create the hydrology scenario and used by ATLSS to generate the ATLSS hydrology corresponding with the SFWMM scenario.
- SFWMM out Archive - The name of the zipfile or archive directory provided to ATLSS that included the daily_stg_minus_lsel.bin file.
- Interface Status - Indicates the current status of the hydrology in the ATLSS Model Interface. "Implemented" indicates that the hydrology is incorporated in the interface. "In Progress" indicates a received hydrology that is being processed for implementation. "Pending" indicates that the hydrology is can not be implemeneted without further information.
- More Information - Links to more information for your convenience. Most of these pages are not part of ATLSS and the information is the responsibility of the provider.